 |
Low Initial Cost |
|
The initial cost of prestressed reservoirs is competitive with alternate means of construction.
|
|
 |
 |
Low Maintenance, Long Life |
|
All surfaces are concrete -- no painting is needed (can be painted if desired), never rusts. No interior maintenance is required, which means no downtime for maintenance drawdowns.
|
|
 |
 |
Quality Construction |
|
Precon's tanks are built by specialists who have the unique knowledge, equipment, and crews necessary for this specialized work; and the proven track record which assures quality construction.
|
|
|
|
|